Record

RepositoryArchives
Reference NumberP/BSL/A/1/4/20
LevelFile
Title'East Cross Route - Area Studies'
Date(s)1973
Description'A Planning Study of the Urban Motorway and the surrounding area, prepared for the Development Committee by the Directorate of Development, London Borough of Tower Hamlets'.
'Sets out results of four area studies covering the East Cross Route between the Bow Interchange and Borough boundary at Wallis Road'.
Extent1 volume
Access StatusOpen
RequestYES - You can order this material to consult in our Reading Room.
Add to My Items

    Collection highlights

    Highlights from across our collections about London’s East End