| Description | Plans, schedule of works, drainage, and structural engineering calculations.
Plans include: 1927: Plans; Cross sections (2); Block A floor plans; Block B floor plans. 1949: Plans and sections. 1950: Cross section; West Block floor plans; Elevation and thickening of existing wall. 1952: Flat layouts; Details of reinforced concrete beams and foundation piers. 1953: Elevations. 1954: Proposed dust chutes; Elevations. 1965: Proposed children's playground and car park. 1970: Pre-war block fourth floor plans; Roof plan; Front elevation and end elevation south. 1975: Proposed alterations to roof of boiler room slab. 1982: Balcony details. 1990: Installation of door entry system. |