| Description | Includes Proposed UDC (Petition); Compensation for Lands to be 'vested' in the LDDC; Civil Engineering Contract (Ove Arup); Interim Support Organisation; Correspondence, inc. BWB; Group 4 and British Airways helicopters; Pump House; Limehouse Basin; Poplar Area Plan; Public Consultation; Correspondence; Michael Heseltine to PB; The Future of Docklands; Tellex Report; Transport for Docklands; Greenwich Docklands; Docklands Development Applications; New Roads in Docklands; Alternative Strategy; London Docklands' Operational Programme 1979-1983; Press Cuttings (various); Sensus Project(s) - London Docklands Studio; Campaign against the UDC in Docklands; Docklands Executive Committee; Docklands Partnership (Meeting).
Includes'Achievements in Tower Hamlets Docklands 1976-81', December 1981, LBTH with introduction by George Chaney, Chairman of Development Committee [found loose] |